Field Intelligence Platform  //  Physics-based screening engine

Power-to-X feasibility
in minutes, not months

Physics-constrained site scoring and hydrogen project screening. The analysis that costs €50,000 from a consultant — delivered instantly, grounded in thermodynamics.

11
Physics constraint domains
6
Screening engines
<2 min
Time to feasibility verdict
100%
Deterministic — no hallucinations

How it works

Step 01  —  Input

Enter your project data

Electrolyzer capacity, electricity price, site location, water source, offtake status — the inputs that actually drive feasibility.

Step 02  —  Compute

Physics engine runs

LCOH calculation, hard-gate screening, weighted scoring across 7+ dimensions, sensitivity sweeps, risk flag detection — all deterministic.

Step 03  —  Verdict

Get your assessment

GREEN / AMBER / RED with score breakdown, risk flags, key drivers, sensitivity tables, and a clear recommendation: proceed, investigate, or reject.

This is what you get

Example H2 Quick Screen — 100 MW electrolyzer, Norway, PPA at €38/MWh

P2X.AI — H2 QUICK SCREEN REPORT  ·  NORDLAND GREEN H2 AS  ·  NORWAY  ·  2026-04-29  ·  CONFIDENCE: 82%
67/100
⬛ AMBER
Marginal feasibility — proceed with caution
€4.2/kg
LCOH base case
4,320 t/yr
Annual H₂ production
€47.2M
Total CAPEX
38,880 m³
Annual water demand
61%
Electricity cost share
€12.4M
Revenue potential/yr
Grid quality
88
Water access
71
Economics
62
Permitting
74
Offtake
45
Technology
80
Logistics
66
NO_OFFTAKE_CONTRACT HIGH_LCOH_VS_TARGET WATER_STRESS_RISK
ScenarioPriceLCOHΔ vs base
Pessimistic€52/MWh€5.3/kg+26%
Base case€38/MWh€4.2/kg
Optimistic€24/MWh€3.1/kg-26%
ScenarioCFLCOHΔ vs base
Low CF0.35€5.8/kg+38%
Base case0.52€4.2/kg
High CF0.65€3.5/kg-17%
ScenarioMultiplierLCOHΔ vs base
+30% CAPEX1.3×€4.8/kg+14%
Base case1.0×€4.2/kg
-20% CAPEX0.8×€3.9/kg-7%
INVESTIGATE — Project is marginally viable at base case but highly sensitive to power price and capacity factor. Offtake risk is the primary blocker. Secure a hydrogen purchase agreement before proceeding to FEED. If power price falls below €30/MWh, project moves to GREEN.

Simple pricing, real physics

H2 Quick Screen

Is your hydrogen project viable? Thermodynamic LCOH with 7-dimension scoring, 9-point sensitivity table, and named risk flags. Know in under 2 minutes.

€49 / report
// what you receive
LCOH (€/kg) — thermodynamically derived, not estimated
Overall score 0–100 + GREEN / AMBER / RED verdict
7-dimension scored breakdown — economics, grid, water, offtake, permitting, tech, logistics
Sensitivity tables — 3 scenarios × power price, capacity factor, CAPEX
Named risk flags — specific blockers identified (e.g. NO_OFFTAKE_CONTRACT)
Recommendation — PROCEED / INVESTIGATE / REJECT with rationale

CCS Feasibility Screen

Carbon capture feasibility across 8 technologies and 12 industrial sources. LCOC in $/tonne, NPV, and A–E grade across 5 axes.

€99 / report
// what you receive
LCOC ($/tonne CO₂) — physics-derived, not benchmarked
A–E grade across 5 axes: economics, tech readiness, scale, environmental, risk
NPV, IRR, payback period across 8 carbon pricing regimes
CO₂ avoidance rate + equipment energy penalty
Recommendation — technology selection guidance

Desalination Screen

Physics-based LCOW across SWRO, BWRO, MED, MSF, and ED. Specific energy consumption, brine management, and 5-dimension scoring.

€99 / report
// what you receive
LCOW (€/m³) — thermodynamically calculated by technology
Specific energy consumption (kWh/m³) + recovery rate
Brine management assessment + disposal risk flags
CAPEX/OPEX breakdown across 5 scored dimensions
GREEN / AMBER / RED verdict with technology recommendation

Methanol / E-Fuels Screen

Methanol production feasibility across 11 routes — e-methanol, bio-methanol, conventional. Full DCF with degradation, IRR, and 6-axis radar scoring.

€99 / report
// what you receive
LCOP ($/tonne) — across all 11 production routes
6-axis radar scoring — economics, TRL, efficiency, CO₂, risk, market
Full DCF model — IRR, NPV, payback with degradation curves
CO₂ intensity comparison across routes
Route recommendation — which technology fits your inputs

Feasibility Memo

Any screening engine output + written investor-ready analysis. Executive summary, risk mitigation, benchmarks. Professional PDF within 24 hours.

€249 / report
// what you receive
Full screening report (your choice of engine)
Written executive summary — board/investor-ready prose
Risk mitigation section — specific actions for each flag
Benchmark comparison — where your project sits vs. industry
Formatted PDF — ready to attach to funding applications

Why engineers trust P2X.ai

[ 01 ] Physics-first

Grounded in thermodynamics

Every calculation traces back to thermodynamic fundamentals. LCOH uses real specific energy consumption, CRF, and vendor-calibrated CAPEX ranges. No hand-waving.

[ 02 ] Deterministic

Reproducible, auditable results

Same inputs, same outputs. Our scoring engine uses weighted decision logic with hard gates — not LLM-generated opinions. You get reproducible, auditable results.

[ 03 ] Built by engineers

No consultants, no guesswork

Created by Aidevo, an AI-native industrial engineering company. We build feasibility engines for hydrogen, waste-to-energy, ammonia, and data centers.

[ 04 ] Transparent

Full methodology visibility

Every report shows the scoring breakdown, the defaults used, and your inputs echoed back. Nothing is hidden. You see exactly how the verdict was reached.

Stop guessing. Start screening.

Know if your P2X project is viable before you spend months and hundreds of thousands on consultants.

Run your feasibility screening →